Permits

Permits

WAA manages a Facility Alteration Permit (FAP) process for work on Airport lands to authorize, track, monitor, record construction and ensure that it satisfies WAA standards.

WAA is the Landlord of Winnipeg James Armstrong Richardson International Airport. Throughout the permitting and construction process, WAA’s Permits Coordinator or an assigned Project Manager will represent the Landlord.
 

All correspondence, questions and submission shall be directed to:

Email: permits@waa.ca
Winnipeg Airports Authority, Inc.
Room 249, 2000 Wellington Ave.
Winnipeg MB R3H 1C2
Attention: Permits Coordinator
Phone: (204) 987-9732
Fax: (204)-987-9790

Click here to download the Facility Alteration Manual

Click here to download the Facility Alteration Permit Application Form.

Click here to download the YWG Equipment Over 9 Meters in Height (Crane) Application Form.

 

In addition to WAA permits other jurisdictions having authority and who may require permit applications are: